5-Axis CNC Machining Center for Complex Aerospace & Automotive Prototypes

Still deciding? Get samples of $ !
Order Sample

Product Description

📋

Basic Information

Surface Treatment
Hard Anodizing
Production Type
Mass Production
Machining Method
CNC Machining
Material
Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron
Package Size
5.00cm * 5.00cm * 10.00cm
Production Capacity
50000 Pieces/Year
CNC Machining Center
⚙️

Product Specification

Available materialMetal: stainless steel, aluminum, steel, titanium, brass, etc.
Plastic: POM, ABS, PVC, PP, PA, PE, PMMA, Rubber
Manufacturing processCNC machining, CNC milling, CNC turning
Tolerance+/-0.002~+/-0.005mm
Surface RoughnessMin Ra0.1~3.2
Drawing AcceptedSTP, STEP, LGS, XT, AutoCAD(DXF,DWG), PDF, or Samples
UsageMedical/Aerospace/Automotive/Living/Machinery industry
Lead Time1-2 weeks for samples, 3-4 weeks for mass production
Quality AssuranceISO 9001:2015, SGS, RoHs
Payment TermsTrade Assurance, TT/PayPal/Western Union
🚀

Our Advantages

01Fast ResponseRFQ feedback within 24 hours and parts delivered in as fast as 10 days.
02High PrecisionTolerances meet ISO 2768 standards, with tighter options available.
03Wide Material ChoiceOver 30 metal and plastic materials to fit your engineering needs.
04Custom FinishesMultiple surface treatment options for metal and plastic parts.
05Experienced Team15+ years in manufacturing with expert engineers for DFM feedback.
06Strict QCFull inspection from material to final product to ensure top quality.

Frequently Asked Questions

Q1. Do you have any quality management system certifications?
Yes, we are ISO 9001: 2015 certified, ensuring rigorous quality control across all processes.
Q2. Do you offer design services for machined parts?
We have design capabilities, but customers must approve the final design. Please submit CAD models, prints, and specifications for a thorough review.
Q3. What is the lead time for samples and who pays for shipping?
Sample lead time is usually 1-2 weeks. Costs depend on part complexity and may be refundable upon production orders. Shipping costs are borne by the customer.
Q4. What manufacturing equipment do you have in your facility?
Our facility includes 26 units of CNC Machining Centers, 18 units of CNC Turning Machines, and 8 Automatic Lathes for high-precision part handling.
Q5. What are your typical production lead times and shipping methods?
Parts can be made in as little as one week. Shipping takes 3-7 days via air-express or 15-30 days by ocean globally.
Q6. How long does it take to receive a quote?
In most cases, we provide a competitive quote within 24 hours, and no longer than 48 hours for complex projects.

Related Products