Factory Price Progressive Die CNC Milling Tooling

Customization: Available
Warranty: Half a Year
Application: Household Appliances, Car, Home Use

Product Description

Basic Information

Model NO.
HH188
Material
Low Alloy Tool Steel
Processing Method
Punching and Shearing Mould
Technics
Cutting Die
Process Combination
Progressive Die
Manufacturing Technology
Computer Technology
Driving Motor Type
Permanent Magnet
Mold Cavity Technology
CNC Milling
Milling Speed
Normal Speed
Parts Detection Method
Measurement of Three Axis NC
After-sales Service
Half a Year
Name
Progressive Stamping Die for Sheet Metal Parts
Lead Time
45 Days
Packing
Wooden Case
Tolerance
+-0.01mm
Die Life
500, 000 Shots
Mould Material
Cr12, Cr12MOV, DC 53, Skh-9, 45# etc
Cavity
1 to Multiple
Certificate
ISO9001:2008, SGS
Production Capacity
300 Sets/Year
Progressive Die CNC Milling Tooling

Our Advantages

Advantage 1
Advantage 2
Advantage 3

Mold Project Process

Common Stamping Process
1 Separating process: Blanking, Cutting, Punching, Notching, Trimming, Parting, Shaving, and so on.
2 Forming process: Bending, Edge Coiling, Curling, Drawing, Ironing, Embossing, Flanging, Bulging, Necking, Flaring, and so on.
Project process layout

Project Process Layout

To control the production time and reduce the probability of claims & returns from end users, making an accurate mold is a critical starting point. We have a complete molding production process to fulfill client needs.

  • Reliability of product quality.
  • Advanced technology implementation.
  • Good economic efficiency.
  • Safe and efficient working conditions.

Professional Production & Capability

Production Display

Our Customers

Customer Partner 1
Customer Partner 2

Packaging & Shipping

Wooden Case Packaging

Frequently Asked Questions

What is the expected life of the stamping die?
The die is designed for high durability, with an expected life of approximately 500,000 shots depending on the material and maintenance.
What materials are used for mold construction?
We use high-quality materials including Cr12, Cr12MOV, DC 53, Skh-9, and 45# steel to ensure precision and longevity.
What is the typical lead time for a project?
The standard lead time is approximately 45 days, which includes the complete design, manufacturing, and testing process.
How do you ensure the precision of the parts?
We utilize CNC milling for cavity technology and Measurement of Three Axis NC for parts detection, maintaining a tolerance within +-0.01mm.
What type of packaging is used for international shipping?
All molds are securely packed in sturdy wooden cases to ensure they are protected from damage during transit.
Are your manufacturing processes certified?
Yes, our production and quality management systems are certified according to ISO9001:2008 and SGS standards.

Related Products